Arrow Tech Home page
Previous  Top  Next
Modify Projectile Nodes

One node needs to be relocated (remember that nodes have been renumbered) so as to capture transition points. This change will be made by editing the node definition table:

After re-locating these nodes, return to the Modeling Tab and hit the Generate Projectile Model button to re-generate new elements between these node locations and update the display as shown below.

Previous  Top  Next
© 2004 Arrow Tech Associates